Tenant Advisory Group logoTenant Advisory Group

Commercial Leasing Resource Center

What Is Second-Generation Office Space?

Someone else already paid to build it. The question is whether their walls, wiring and leftover obligations suit you.

A commercial office building lobby

By Tenant Advisory Group · Updated

Short answer

Second-generation office space is space a previous tenant already built out, with walls, ceilings, lighting and often cabling or furniture left in place. Reusing it can shorten your schedule and reduce construction cost. The risks are that it may not fit your layout, its systems may be aged, and you could inherit obligations to remove what is there when your lease ends. Inspect first, then settle those points in writing.

What the term means

First-generation space has never been occupied and is usually delivered unfinished, so a tenant builds it from scratch. Second-generation space has had at least one occupant, and that occupant's improvements are still there. You may hear it called existing conditions, or a previously improved suite. Second-generation space ranges from a dated floor that needs demolition to a recently finished suite that a company barely used.

It is different from a spec suite, which a landlord builds in advance for an unknown tenant, and from a sublease, in which you rent from the current tenant instead of the landlord. A sublease often is second-generation space, but the term describes the condition of the space and not the contract you sign. Our guides on spec suites and subleases cover those choices.

Why tenants choose it

The appeal is time and capital. If a layout is close to what you need, the work may be limited to paint, flooring and a few changes, which means less design, fewer permits and a shorter path to move-in. It suits a company with a lease expiring soon, or one that would rather spend on something other than construction.

One firm that came to us with a short window and no time for a build-out described its result this way:

“we signed a lease on a space that required no work, and Bill was even able to get the current tenant’s office furniture included in the deal.”
— BLOCKOWICZ & TOGNOCCHI, TAG client

Reuse has a negotiating side too. A landlord spending little on construction may have more room on rent or free rent, or may put the savings toward the changes you do want. Ask, because less construction does not automatically mean a better deal. Compare proposals on net effective rent and on your own out-of-pocket cash.

What to inspect before you rely on it

A tour shows finishes. Most of the risk is in what you cannot see from the reception desk. Bring your architect, contractor or project manager to the second visit, and walk the space with your own test fit in hand.

  • Does our test fit work with the walls in place, or do we end up demolishing most of them anyway?
  • How old are the HVAC units serving this suite, who maintains them, and who pays to replace them?
  • Are there enough thermostats and zones for the way the space is now divided?
  • Is electrical capacity adequate for our equipment, and where is the panel?
  • Does the existing cabling meet our needs, or will our IT team want it replaced? Is old cable left above the ceiling?
  • Are sprinklers, exit routes and fire alarm devices right for the layout we plan?
  • Are the restrooms and route to the suite accessible, and has anyone reviewed them?
  • Are there signs of water damage, stained ceiling tiles or worn flooring that will have to be replaced?
  • Is any supplemental cooling, kitchen plumbing, raised floor or specialty equipment still in place, and do we want it?
  • Will the landlord provide as-built drawings and the service records for the equipment?

Treat a walkthrough by your contractor as part of the search, not part of construction. Finding a mechanical problem before the letter of intent gives you leverage. After signing, it may simply be your cost.

Restoration exposure: the part tenants miss

This is the main reason to read the lease carefully. Restoration clauses often require a tenant to remove alterations and return the space to a stated condition when the lease ends. If the clause is loose, you can be asked at the end of your term to remove improvements you never built.

  • Ask that the lease state you have no obligation to remove any improvements existing on the delivery date.
  • Photograph the space and attach a dated condition report or plan to the lease, so the starting point cannot be disputed later.
  • Identify specific items of concern by name, such as internal stairs, data rooms, supplemental cooling units, safes and old cabling.
  • If the prior tenant left furniture or equipment, get written confirmation of who owns it, whether you are buying it or borrowing it, and whether you may dispose of it.
  • Confirm that the landlord, and not you, deals with anything the previous tenant was supposed to remove but did not.

Our guide to restoration and surrender clauses goes deeper on surrender language in general. What matters for second-generation space is the delivery-date baseline.

As-is language and accessibility

Second-generation space is frequently offered as-is. Read what that phrase covers. Ask that the landlord still deliver building systems serving the suite in good working order on the delivery date, and repair latent defects it knew about or that appear within a stated period. As-is should describe the finishes you accepted, not the condition of the mechanical equipment behind them.

Accessibility should not be assumed either. Under federal regulations for places of public accommodation, both the landlord and the tenant are covered, and the two may allocate responsibility between themselves by lease or other contract (28 CFR 36.201). The ADA.gov primer describes a continuing duty for small businesses to remove barriers in existing facilities where this is readily achievable. Alterations must be made accessible to the maximum extent feasible, and normal maintenance such as painting generally does not count unless it affects usability (28 CFR 36.402). Whether these rules apply to your office and how they apply to your planned changes is a question for your attorney and architect, so ask before you agree to as-is terms.

Deciding whether to reuse or rebuild

  1. Write down your must-have rooms and adjacency needs before you tour, so a nice finish does not talk you out of them.
  2. Test-fit the leading candidates and mark what stays, what changes and what goes.
  3. Price the changes, including demolition, since removing work can cost more than people expect.
  4. Ask how long the reused option actually saves, after permits and long-lead items.
  5. Negotiate an allowance for the changes you still need, plus landlord work on any system that fails inspection.
  6. Put the delivery condition, equipment ownership and restoration baseline in the letter of intent.

TAG represents tenants, and we often compare a reused suite with a new build-out on the same worksheet, with the cost of changes and the restoration position stated side by side, so the lower apparent cost is tested before anyone relies on it.

Frequently asked questions

Is second-generation space always cheaper?

Not always. It saves money when your layout fits what is there. If you end up demolishing most of it, or if aging systems need replacing, the savings can shrink or disappear, so price the changes before deciding.

Can we still get a tenant improvement allowance?

Often yes, though the amount depends on the deal. Landlords consider term, credit and how much work the suite needs. Ask whether any unused money can go toward other costs or rent.

Who owns the furniture a prior tenant left behind?

Do not assume anything. It may belong to the landlord, the prior tenant or a lender. Get written confirmation of ownership and of your right to use, keep or dispose of it.

Do we have to remove the old build-out when we leave?

That depends on your lease wording. Ask for a clear statement that you are not responsible for improvements existing on delivery, and have your attorney confirm it works with the surrender clause.

Sources

This guide is general information, not legal advice. Have your attorney review any lease before you sign it.

Want a second opinion on your lease?

Tell us about your space and your timing. We will walk you through the options.

CallContact Us